| Simonetta ARE 110 Turbine Installation / DSCN5088
Steve Waller 7/4/2006 The tower is now standing perfectly. The end of the gin pole is near the ground and is fastened to its anchor. Now the orange rigging can be removed. Steve@UPWallers.net |
